Heavy Haulage - 300 Metric Tons of Steel on the Move
 
 

20 and 18 meters long are the two industrial furnaces, which the Austrian forwarding company Felbermayr is to transport from a ship dock on the Danube to an aircraft component company. The total weight of both furnaces of a good 300 tons is only one of many problems. The steel colossus is almost seven metres high - too high to pass through most of the bridges or tunnels. An insoluble... see more

20 and 18 meters long are the two industrial furnaces, which the Austrian forwarding company Felbermayr is to transport from a ship dock on the Danube to an aircraft component company. The total weight of both furnaces of a good 300 tons is only one of many problems. The steel colossus is almost seven metres high - too high to pass through most of the bridges or tunnels. An insoluble... see more
No trailer available

Community

RUNTIME
N/A min
RELEASED
Jan 1, 2017
COUNTRY
DE
LANGUAGE
DE
SPOKEN
German
BUDGET
N/A
REVENUE
N/A